CV Pty Ltd engaged the skills of the Ozzi Kleen Group to assist with their Accommodation Village in Sarina, Queensland, Australia.

The project involves a two stage development with the first stage being a peak accommodation occupancy level of 402 persons. Stage 1 involves 49 blocks of 2 x 3 bed accommodation buildings and 9 blocks of 4 x 3 bed accommodation buildings. Stage 1 development is also inclusive of an office block and ancillary facilities such as kitchen and dining, laundry and recreational facilities.

Stage 2 of the project proposal involves expansion of the Stage 1 infrastructure to include an addition of 198 rooms consisting of a 1 block of 2 x 3 bed accommodation building and 16 blocks of 4 x 3 bed accommodation buildings.

Although the infrastructure and waste water generation rate will be via two stages of development, the waste water treatment and treated water handling will be developed for the full stage loading, that is Stage 1 and Stage 2 combined. The basis of the waste water treatment system design will be accommodation for 600 persons and the waste water load generated by the Site Offices, estimated at a peak of 140 persons.

During July 2013 our company installed and commissioned a containerised sewage treatment system (SC825), which caters for 165,000 litres per day. The system was custom designed for the particular project.

The waste water effluent output was designed to an advanced level allowing for irrigation to the Sarina Golf Course adjoining the QCV Sarina Project.